Building information modeling definition

Hem / Teknik & Digitalt / Building information modeling definition

Governments worldwide are making it mandatory: Singapore's CORENET X requires BIM for building approvals, the Netherlands mandates it for public infrastructure, and Australia requires it for federal projects. Sustainability and lifecycle performance: Design with intent, operate with insight

BIM supports energy-efficient and environmentally responsible building practices through data-rich simulations.

  • Optimizes material use and energy performance during design.
  • Tracks sustainability KPIs across construction and operation.
  • Enables facility teams to manage assets for long-term efficiency and reduced carbon footprint.

Pro Tip: Extend your BIM model into the operations phase using digital twin technology.

Unlike simple 3D modeling tools like SketchUp or Rhino, BIM contains embedded information essential for the entire project lifecycle—from design through construction to facility management. Issues that would take weeks to resolve on-site can be identified and fixed in days during the coordination phase.

From coordinated models, teams can extract Combined Services Drawings (CSD) that show exactly how different building systems interface—critical information for contractors during construction.

Beyond spatial coordination, BIM enables time-based planning through 4D BIM.

By linking the 3D model to the construction schedule, project teams can visualize how the building will be constructed over time.

Viewing a 5D BIM model within a common data environment to run a structure sequencing breakdown based on pour numbers.

Level 5 BIM adds cost estimations, budget analysis, and budget tracking to the information model.

LOD 400 provides exact routing, supports, connections, and clearances contractors need to build.

For Owners (LOD 500): The as-built model represents what was actually constructed, including field changes.

building information modeling definition

Too much detail upfront wastes time on elements that may change. How does the HVAC duct connect to the air handler? W

When BIM is connected to real-time building performance systems, it becomes the backbone for advanced capabilities like fault detection and diagnostics that help teams catch anomalies early and respond proactively.

What are the benefits of BIM?

Building Information Modeling (BIM) delivers measurable advantages across every stage of the building lifecycle, from early design to ongoing facility operations. 

By unifying data, workflows, and visualization, BIM drives efficiency, accuracy, and collaboration like never before.

Here’s how it translates into real-world impact:

1.

Software like SketchUp made 3D modeling accessible, even though SketchUp itself isn't true BIM—it captures geometry but lacks the intelligent object data that defines BIM.

Contractors and subcontractors have been slower to adopt, often continuing with 2D AutoCAD workflows familiar to senior staff.

Many experienced contractors prefer 2D for good reasons:

  • Cost: BIM software licenses are expensive, especially for small subcontractors
  • Talent: Hiring BIM-skilled staff is difficult and costly in competitive markets
  • Workflow familiarity: Decades of experience with AutoCAD make change resistance natural
  • Detail representation: Certain construction details—annotations, call-outs, dimension blowups—are legitimately easier to produce and read in 2D

Can we blame them?

This is called Open BIM, meaning that another layer of protection is added against clashes, adding value to the project at every stage. These complex, high-stakes projects demand coordination across dozens of disciplines, stakeholders, and regulatory frameworks. Later on, CAD turned 3D, which brought more realistic visuals to blueprints.

Real-time collaboration: BIM enables multiple disciplines to collaborate on the same model. Each asset comes with its specifications, performance data, and maintenance records, all accessible directly from the model. It significantly shortens review cycles and improves coordination among design and construction teams.

2.

If you’re using 2D CAD and working with drawings and/or digital prints, you can safely say you’re at level 0. This model isn’t just a 3D drawing; it contains real data about every part of the building, such as walls, lighting, HVAC systems, and equipment.

BIM helps teams see how a building will look and perform even before it’s built, so they can fix issues early, save time, and avoid costly mistakes.

It shall enable real-time monitoring of energy consumption, occupancy patterns, and system performance.

How much does BIM cost?

The cost of implementing BIM varies depending on the project’s size and complexity. 

Smaller residential projects might cost around $5,000, while large commercial or infrastructure projects can exceed $100,000.

Centralized data management: All project data is stored in a Common Data Environment (CDE) — a shared repository that synchronizes updates across teams. Design changes instantly update costs—enabling proactive management instead of reactive overruns.

Documentation: Coordinated models generate Combined Services Drawings, concrete plans, and setting-out drawings that match the digital coordination.

FM Handover: The as-built model becomes a digital twin operational asset with equipment data in COBie format, delivering value long after construction.

Subcontractors receive the main contractor's construction model and develop their trade-specific scope:

Clash Avoidance: MEP subcontractors model their systems (HVAC ducts, electrical conduits, plumbing pipes, fire protection) and coordinate to ensure no clashes within their scope or with other trades.

CDE Submission: Upload models to the project's Common Data Environment—typically Autodesk Construction Cloud, ProjectWise, or OpenBIM platforms like BIMCollab—for coordination review.

Shop Drawings: Generate fabrication and installation drawings from their coordinated BIM model, showing exact routing, connections, and equipment layouts.

One of BIM's most immediate benefits is the ability to identify clashes before construction begins.

Not every firm has the resources or expertise to implement BIM internally.